
Ried im Innkreis, Austria
TEAM 7 Welt
Head office and showroom
Sheep woolAcoustic ceilings, meeting pods and wall liningsISOLENA Klemmfilz and Schafwollfilz
About the project
ISOLENA reference · Vienna, Austria
Green Cube is a seven-storey building with around 319 serviced studios in Vienna's Nordbahnviertel. According to ISOLENA, 7,080 m² of ISOLENA Optimal is fitted in the interior walls, and the building is pre-certified for DGNB Gold.

The figures come from the sources at the bottom of the page. Byeco did not supply this project.
Green Cube is in Vienna's Nordbahnviertel, the same area as Taborama, and has seven storeys with around 319 serviced studios. The client is STRABAG Real Estate, and ISOLENA names Böhm BiB as the contractor.
The interior walls hold 7,080 m² of ISOLENA Optimal.
Green Cube is one of three STRABAG Real Estate projects among ISOLENA's references. Taborama has 29,000 m² of sheep wool as interior insulation, and the Silo Next office building, like Green Cube, has ISOLENA Optimal in the interior walls.
According to STRABAG, the building was built in 2024–2026.
Questions and answers
Green Cube has ISOLENA Optimal, 7,080 m² in the interior walls according to ISOLENA. It is sheep wool insulation with a density of 18 kg/m³.
According to ISOLENA, Green Cube is pre-certified for DGNB Gold, and the sheep wool in the interior walls contributes to the pre-certification. The client STRABAG Real Estate states that the building has a DGNB certificate.
Every figure about the project is stated by one of the sources below, checked 6 October 2026. The product data comes from Byeco's range.

Ried im Innkreis, Austria
Head office and showroom
Sheep woolAcoustic ceilings, meeting pods and wall liningsISOLENA Klemmfilz and Schafwollfilz
About the project

Alkoven, Austria
Medical and therapy centre
Sheep wool2,000 m²ISOLENA Optimal, 50 mm, 18 kg/m³, interior
About the project

Vienna, Austria
Offices
Sheep woolInterior walls and windowsISOLENA Optimal and sheep wool joint tape
About the project
Consultation
Thirty minutes on your project, the requirements and what we can supply.